Black Friday week

Black Friday week

📄 Digital book in PDF · read it on your phone or print it

The Building Regulations for England in Drawings One Rule per Page, So You Can Check Your Work Before the Inspection

Footings, wall ties, the DPC, escape windows, extract fans, drains, stairs and U-values. Every topic has its own page: the drawing first, then what you need to remember. 67 illustrated pages.

I WANT THE REGS IN DRAWINGS

🔒 Secure checkout · PDF by email · 30-day guarantee

Every topic, its own pageEach rule drawn as a section or a plan, with the explanation alongside
67 illustrated pages9 parts, from the map of the Approved Documents to the numbers on one page
Up-to-date sourcesBuilding Regulations 2010 (England), the Approved Documents in force (Part L and Part F 2021 editions) and the Building Safety Act 2022
PDF by emailFormat

Look Inside the Book

Every page has one large drawing and a box with the measurements and rules you need to know:

Wall ties 900 × 450 mm, extra at 300 mm within 225 mm of openings.
Wall ties 900 × 450 mm, extra at 300 mm within 225 mm of openings.
Hardcore, blinding, DPM (commonly 1200 gauge) linked to DPC, insulation, slab.
Hardcore, blinding, DPM (commonly 1200 gauge) linked to DPC, insulation, slab.
0.33 m² clear, 450 × 450 mm minimum, bottom no higher than 1100 mm.
0.33 m² clear, 450 × 450 mm minimum, bottom no higher than 1100 mm.
Glazing up to 25% of extension floor area plus removed openings; more needs a calculation
Glazing up to 25% of extension floor area plus removed openings; more needs a calculation
Soakaway at least 5 m from any building; rainwater drains no flatter than 1:100
Soakaway at least 5 m from any building; rainwater drains no flatter than 1:100
Private stair: rise 220 mm max, going 220 mm min, 42° max, 2R + G 550–700 mm
Private stair: rise 220 mm max, going 220 mm min, 42° max, 2R + G 550–700 mm
Start notice, commencement within five days, your stages, completion within five days: one blank sheet.
Start notice, commencement within five days, your stages, completion within five days: one blank sheet.
Approval, calcs, U-values, electrical, gas, ventilation, drain test, glazing, party wall: tick them off.
Approval, calcs, U-values, electrical, gas, ventilation, drain test, glazing, party wall: tick them off.

Swipe to see more →

These are real pages from the book. The table of contents is the full one: 9 parts and 63 topics.

The Problem Isn't You. It's How It Was Explained to You.

You're standing in a new loft bedroom. The window frame is in and the inspector is due on Thursday. Is that opening big enough to count as an escape window?

You go back to the fire safety guidance. The answer is in there, but it's spread across paragraphs, notes and cross-references. The area, the width, the height and the sill are all in different sentences.

0.33 m² clear, 450 × 450 mm minimum, bottom no higher than 1100 mm.

In this book the escape window gets one page: a drawn casement with the clear opening shaded, 0.33 m² written inside it, 450 mm marked on each side and a line showing the bottom of the opening no higher than 1100 mm above the floor.

The same goes for wall ties, the ground-bearing slab, the 25% glazing limit, the drain air test and stair rise and going. Each one has its own page.

You check the window against the drawing and you know the answer before the inspector asks. You know where to look, and what the number is.

COMPARE FOR YOURSELF

The Same Topic, Two Ways to Learn It

THIS
  • The guidance: line after line of text
  • Floor layers explained only in words
  • You get to site still unsure
Where a floor is laid directly on the ground, provision is to be made against moisture rising from below. Topsoil and organic material are first removed and the area is filled with a compacted granular layer, which is then blinded to give an even surface. A continuous membrane is placed over it, joints sealed and edges joined to the barrier in the adjacent walls, after which insulation and concrete are laid in turn, as described in the paragraphs that follow and shown in a diagram elsewhere.
FOR THIS
  • The slab drawn layer by layer
  • The materials and the order in one box
  • You see it and you get it
Hardcore, blinding, DPM (commonly 1200 gauge) linked to DPC, insulation, slab.
CONTENTS

Take a Look at the 9 Parts and 63 Topics

The map before you start, building control and sign-off, structure, damp, fire, ventilation and energy, drainage, stairs and services, two jobs worked step by step and an on-site review: 67 pages, all illustrated.

IThe Map Before You Start · pp. 5-10
  1. How to use this book
  2. England only: Scotland, Wales and Northern Ireland differ
  3. The Approved Documents, A to T, on one page
  4. What counts as building work, and what's exempt
  5. Planning, Building Regs and Party Wall: three different things
  6. What the Building Safety Act changed on small jobs
IIBuilding Control and Sign-off · pp. 11-18
  1. The two building control bodies
  2. Route 1: Full plans application
  3. Route 2: Building notice
  4. Competent person schemes: work that self-certifies
  5. Your duties as client, designer and contractor
  6. The inspection stages: what to notify and when
  7. The completion certificate: why it matters when the house is sold
  8. Work done without approval: regularisation and enforcement
IIIGround and Structure (Part A) · pp. 19-26
  1. Foundation depth: frost, clay and trees
  2. Strip foundations: width, thickness and position
  3. Building near or over a public sewer
  4. Cavity walls and wall ties
  5. Lintels: bearing, type and the cavity tray
  6. Steel beams and padstones in a knock-through
  7. Restraint: straps on floors, roofs and gables
  8. Loft floors: new joists, not the old ceiling joists
IVKeeping the Damp Out (Part C) · pp. 27-32
  1. The DPC: at least 150 mm above ground
  2. Cavity trays, stop ends and weep holes
  3. Ground-bearing slab: DPM, hardcore and insulation
  4. Suspended timber floors: the void and the airbricks
  5. Radon: when you need protection
  6. Roofs: ventilation and condensation
VFire Safety in Houses (Part B) · pp. 33-39
  1. Smoke alarms: mains-wired and interlinked
  2. Escape windows: the 0.33 m² rule
  3. Inner rooms: the room you can only leave through another
  4. Loft conversion: the protected stair down to the exit
  5. Fire doors on the stair: FD20 and what to check
  6. Building near the boundary
  7. Cavity barriers, closers and fire-stopping
VIVentilation, Heat and Energy (Parts F, L, J, G) · pp. 40-46
  1. Extract fans: the rates for each room
  2. Background and purge ventilation
  3. U-values for new elements in an extension
  4. The glazing limit and how to justify more
  5. Renovating or converting: when you must upgrade
  6. Heating appliances, flues and CO alarms (Part J)
  7. Hot water safety and water efficiency (Part G)
VIIDrainage, Stairs, Glazing and Services · pp. 47-55
  1. Below-ground drains: gradient and bedding
  2. Access points and the drain test
  3. Above-ground waste: traps and branch lengths
  4. Rainwater and soakaways
  5. Stairs: rise, going and pitch (Part K)
  6. Headroom and handrails
  7. Guarding and the 100 mm sphere
  8. Safety glazing: the critical zones
  9. Electrics (Part P) and sound (Part E)
VIIITwo Jobs Worked Step by Step · pp. 56-63
  1. Loft conversion 1: the survey and the route
  2. Loft conversion 2: floor, steels and roof
  3. Loft conversion 3: the stair and the fire route
  4. Loft conversion 4: ventilation, sound and sign-off
  5. Rear extension 1: before you dig
  6. Rear extension 2: footings to DPC
  7. Rear extension 3: walls, openings, roof
  8. Rear extension 4: services and completion
IXOn-Site Review · pp. 64-67
  1. Inspection timeline with a blank checklist
  2. The papers to collect for sign-off
  3. Frequent snags, drawn
  4. The numbers on one page

One Page, One Topic, All Clear

Think of it this way:

The trench for the rear extension is dug and building control is booked for the morning. You need the footing depth and width right before anyone looks in that trench.

You open the strip foundations page and see the trench in section: the width and thickness of the footing labelled, and the depth below ground drawn against frost, clay and nearby trees.

Soakaway at least 5 m from any building; rainwater drains no flatter than 1:100

The same with lintel bearings, the cavity tray, extract fan rates, drain gradients and the 100 mm sphere on guarding: each one on its own page.

Building Regulations Illustrated is 9 parts and 63 topics, all drawn, with a loft conversion and a rear extension worked step by step and a blank inspection timeline to fill in at the end.

What you see drawn, you don't have to memorize.

What's Inside Building Regulations Illustrated:

Ipp. 5-10

The Map Before You Start

Start with the map: the Approved Documents on one page, what counts as building work, and planning vs regs vs party wall, so you know which rule applies before you turn to any other page. England only, with the Building Safety Act changes.

IIpp. 11-18

Building Control and Sign-off

Local authority or registered approver, full plans or building notice, competent person schemes, your duties, the inspection stages, the completion certificate and regularisation.

IIIpp. 19-26

Ground and Structure (Part A)

Foundation depth and width, building near a sewer, cavity walls and ties, lintels and cavity trays, steels and padstones, restraint straps and new loft joists.

IVpp. 27-32

Keeping the Damp Out (Part C)

The DPC at 150 mm, cavity trays and weep holes, the ground-bearing slab, suspended timber floors, radon and roof ventilation.

Vpp. 33-39

Fire Safety in Houses (Part B)

Interlinked smoke alarms, escape windows, inner rooms, the protected stair in a loft conversion, FD20 doors, the boundary and cavity barriers.

VIpp. 40-46

Ventilation, Heat and Energy (Parts F, L, J, G)

Extract fan rates, background and purge ventilation, U-values, the glazing limit, when renovation means an upgrade, flues and CO alarms, and hot water safety.

VIIpp. 47-55

Drainage, Stairs, Glazing and Services

Drain gradients and bedding, access points and the drain test, traps, soakaways, stair rise and going, headroom, guarding, safety glazing, electrics and sound.

VIIIpp. 56-63

Two Jobs Worked Step by Step

A loft conversion and a rear extension, each in four steps, from the first survey to sign-off.

IXpp. 64-67

On-Site Review

A blank inspection timeline, the papers to collect for sign-off, frequent snags drawn, and every key number on one page.

At the end of the book: Two jobs worked step by step, a blank inspection timeline and every key number on one page.

Plus: 2 Free Books

Site Self-Check Workbook: 60 Drawn Questions

BONUS 1: «Site Self-Check Workbook: 60 Drawn Questions»

Value on its own: US$ 17.90

Look at a drawn detail, spot what's missing and check the answer, so you can test yourself on each part before the inspector does.

Frequent Mistakes, Drawn: Before & After Cards

BONUS 2: «Frequent Mistakes, Drawn: Before & After Cards»

Value on its own: US$ 14.90

The most frequent snags on site, each one drawn wrong and then right on a single card, so you can catch them at a glance.

Black Friday week · ends 30 Nov

Building Regulations Illustrated with 2 Free Books

  • Building Regulations Illustrated: 67 illustrated pagesUS$ 63
  • BONUS 1: Site Self-Check Workbook: 60 Drawn QuestionsUS$ 17.90
  • BONUS 2: Frequent Mistakes, Drawn: Before & After CardsUS$ 14.90
  • High-resolution PDF to printIncluded
Total value US$ 95.80
BLACK FRIDAY PRICE:
US$ 27
You save US$ 68.80
YES, I WANT BUILDING REGULATIONS ILLUSTRATED FOR US$ 27

📄 This is a digital PDF book sent to your email: nothing is printed or shipped.

Secure purchaseEncrypted payment30-day guarantee

PDF by email: We email you Building Regulations Illustrated as a PDF, together with the two free books. It's a single payment: no installments, no extra charges.

Who This Book Is For

You're training in building control

You're training in building control

You came from site and now you're learning the regs. Each Approved Document is broken into drawn pages, in the order a job is built.

You're self-building or renovating your own home

You're self-building or renovating your own home

Before each visit, open the page for that stage and check the footings, DPC or drains against the labelled drawing. You'll know what building control is going to look at.

You've been building for years

You've been building for years

You know how to build it. The book puts what each Part asks for, and the papers for sign-off, on pages you can print and keep in the van.

Everything You Get Today

US$ 95.80US$ 27
YES, I WANT BUILDING REGULATIONS ILLUSTRATED FOR US$ 27

📄 This is a digital PDF book sent to your email: nothing is printed or shipped.

30DAYS
GUARANTEE

30-Day Guarantee

Try Building Regulations Illustrated for 30 days, bonus books included.

We refund everything if the file won't open, if the book isn't what you see here, if you were charged twice or if the email doesn't arrive. Just email us.

You pay once. No subscriptions.

Frequently Asked Questions

Is it for me if I've been building for years?

Yes. It isn't a beginner's book on how to build: it sets out what each Part of the regs asks for and what's checked at each stage, drawn and in build order, so you can find it fast.

Where does the content come from?

From the Building Regulations 2010 for England and the Approved Documents in force, including the 2021 editions of Part L (energy) and Part F (ventilation), and the changes to building control brought in by the Building Safety Act 2022. Every measurement and threshold is checked against those editions. It covers England only: Wales differs in some Parts, and Scotland and Northern Ireland have their own systems.

Is it official material?

No. It's an independent illustrated guide. All the drawings are our own, and it isn't affiliated with or endorsed by the Government or any building control body.

Does it replace training or professional advice?

No. It doesn't replace a structural engineer's design, a registered electrician, a fire risk assessment or the decision of your building control body, and it can't guarantee that work will pass inspection.

Are the practice questions the ones from an exam?

No. The 60 drawn questions in the workbook were written for this book. They aren't official questions from any exam or assessment, and the book doesn't come with a certificate or count as a qualification.

When and how does it arrive?

As a PDF by email, sent to the address you enter at checkout. The two bonus books come the same way.

Do I have to pay every month?

No. It's a one-off payment, with no subscription.

Can I have it on paper?

Yes. It's an A4 PDF, ready to print, so you can keep the pages you need on site or in the van.

How does the refund work?

You have 30 days. We refund everything if the file won't open, if the book isn't what you see on this page, if you were charged twice or if the email doesn't arrive: just email us.

Before You Close This Page

No more rereading the Approved Documents and forgetting it all.

Lintels, the DPC and stair pitch: you see them drawn, and that's it.

You get to every inspection knowing where everything is.

Drawings make studying faster.

The book is right below.

One-time payment: US$ 27 · Guarantee: 30 days · PDF by email

YES, I WANT BUILDING REGULATIONS ILLUSTRATED FOR US$ 27

📄 This is a digital PDF book sent to your email: nothing is printed or shipped.